Electronic Thesis/Dissertation
Conceptual Framework for adapting Technical Performance Measurement methodology for Early Stage Research and Development projects Open Access
Early stage research and development (R&D;) projects, programs, or efforts are characterized by a high degree of uncertainty. In the public sector, these efforts are defined as those with technology readiness levels up to 4. Both project management and systems engineering cultures proliferate throughout the public sector. Project management traditionally uses earned value management system to track the progress of its projects. Systems engineers apply Technical Performance Measurement methodology (TPM) to R&D; efforts to monitor progress of quality factors with respect to those efforts. Both of these methods have numerous alternative implementations, and both strive to provide risk management indicators and insight into future performance. This paper discusses a conceptual framework for monitoring early stage R&D; by altering a TPM method. By quantifying and monitoring the “learning” or technical uncertainty toward the project goal, early stage R&D; is given a measurement for technical progress. Learning values are determined using pairwise comparisons of R&D; activities that contribute to learning. How the effort increases learning, or degrades uncertainty, over time serves as the baseline for performance management. In order to predict future performance, the learning baseline is regressed in linear segments. Using simulated project status, those predictions are shown to have acceptable uncertainty by validating against prediction intervals.
- License
Notice to Authors
If you are the author of this work and you have any questions about the information on this page, please use the Contact form to get in touch with us.
Relationships
Items
Thumbnail | Title | Date Uploaded | Visibility | Actions |
---|---|---|---|---|
|
Agee_gwu_0075A_13833.pdf | 2018-01-15 | Open Access |
|