Search Constraints
Filtering by:
Committee Member
Malalla, Ebrahim
Remove constraint Committee Member: Malalla, Ebrahim
GW Unit
Engineering Management
Remove constraint GW Unit: Engineering Management
Type of Work
Thesis or Dissertation
Remove constraint Type of Work: Thesis or Dissertation
« Previous |
1 - 50 of 81
|
Next »
Number of results to display per page
Search Results
Select an image to start the slideshow
Improving Project Performance through Implementation of Agile Methodologies in the Renewable Energy Construction Industry
1 of 50
A Bayesian Network and Real Options Methodology for Engineering Infrastructure Investment Decisions Under Uncertainty
2 of 50
Perceived Value Technology Adoption Model for Accelerating Enterprise Transformation
3 of 50
Detecting Anomalies in Network Behavior and Identifying Threats Using Statistical Process Control
4 of 50
Technology Maturation Framework: Extending the Technology Readiness Index to the Systems Engineering Lifecycle
5 of 50
Methodology to Evaluate Proposed Leading Indicators of Space System Performance Degradation Due to Contamination
6 of 50
Estimating Uncertainty Attributable to Inconsistent Pairwise Comparisons in the Analytic Hierarchy Process (AHP)
7 of 50
Forecasting Schedule Delays in IT Project Management Using Predictive Analytics Model
8 of 50
A Model-Based Application of Artificial Intelligence for Behavioral Pattern Analysis and Improved Early Intervention in Autism
9 of 50
Enhancing Decision Analysis During Project Concept Evaluation using Monte Carlo Simulation and Other Decision Support Tools: A Case Study on the Onshore/Swamp Oil & Gas Asset Development in Nigeria
10 of 50
An Investigation of Mura and Muda in Large Aerospace Development Projects
11 of 50
Evaluating LIMS Implementation Success in an R&D Organization from an End-User Perspective: A Structural Equation Modeling Approach
12 of 50
Analysis of Cybersecurity Vulnerability Trends and Forecast Modeling
13 of 50
The Effects of Dynamic Ecosystem Variables on the Adoption of New Technology Products - Case Studies on Portable Audio and Infotainment Industries
14 of 50
Improving Incident Ticket Resolution Time Using A Six Sigma DMAIC Methodology
15 of 50
A Risk Analysis Tool to Evaluate the ROI of Major Defense Acquisition Program Knowledge Based Acquisition Practice Implementation for Engineering Managers
16 of 50
A Model-Based Framework for Analyzing Cloud Service Provider Trustworthiness and Predicting Cloud Service Level Agreement Performance
17 of 50
Application of Analytical Hierarchy Process and Linear Programming to Decision and Cost Optimization for Pipeline Maintenance in Nigeria
18 of 50
Graph-based Event Correlation for Network Security Defense
19 of 50
Holacratic Engineering Management: A Lean Enterprise System Engineering Innovation
20 of 50
Prioritizing Security Controls Using Multiple Criteria Decision Making
21 of 50
Expanding the Stakeholder Requirements for Urban Water System Resilience
22 of 50
The Effect of Integrating Risk Management on Large-Scale Information Technology Projects Using an Integrated Software Risk Management Tool
23 of 50
Level of Repair Analysis for the Enhancement of Maintenance Resources in Vessel Life Cycle Sustainment
24 of 50
Predicting Civilian Engineer Turnover by Organization Environmental Factors in the US Federal Government
25 of 50
Structured Expert Judgement Elicitation of Use Error Probabilities for Drug Delivery Device Risk Assessments
26 of 50
Multi-factor Sentiment Analysis for Gauging Investors Fear
27 of 50
A Multi-Criteria Analysis Technique Using Compromise Programming and the One-Sided Tolerance Interval for the Analysis of Experimentally Planned Tests Evaluating Key Requirements
28 of 50
Examining Critical Material Supply Chains Through a Bayesian Network Model
29 of 50
Conceptual Framework for a Rapid Space Launch Capability
30 of 50
Engineering Management Strategy for Improving Knowledge Sharing Concerning Risk Prediction Models for Hospital Readmissions
31 of 50
An Engineering Management Approach to Electrical and Electronic Fulfillment Inventory Investment Improvement Planning at Low Cost
32 of 50
A Resilience Analysis of Buildings Critical Systems Using Bayesian Networks
33 of 50
Enhancing Traditional Earned Value Management with Three-Point Estimates to Produce Probability Based Performance Forecasts and Contingency Funding Projections for Engineering-Construction Projects
34 of 50
A Multi-Criteria Decision-Making Model for Evaluation of Waste-to-Energy Technologies from Municipal Solid Waste: Combustion or Gasification for Puerto Rico?
35 of 50
Identifying Areas of Competitive Advantage: Developing a Predictive Tool to Determine New Drug Approval Success
36 of 50
Assessing the Influence of Building Geometry on Active Shooter Event Outcomes
37 of 50
Using Machine Learning Algorithms to Predict Technology-Based Small Business Commercialization
38 of 50
An Engineering Management Approach to Develop a Practical Capital Funding Model for Technology Start-up
39 of 50
A Predictive Analytical Model for Predicting Munitions Surface Clearance Decontamination Activities
40 of 50
Applying Multi-Criteria Decision-Making Methods to the Department of Defense Cloud Service Offering Security Authorization Process
41 of 50
Energy Storage Systems Architecture Optimization to Facilitate Full Penetration of Distributed Rooftop Photovoltaic Generation
42 of 50
Integrating Immature Systems and Program Schedule Growth
43 of 50
US Knowledge Worker Augmentation versus Replacement with AI Software: Impact on Organizational Returns, Innovation, and Resistance
44 of 50
An Investigation of Anomaly-based Ensemble Models for Multi-Domain Intrusion Detection
45 of 50
PROPER Model: an Optimization Methodology to Reduce Cost and Lead Time for Primary Pressure-Retaining Components in Safety Relief Valves
46 of 50
Reducing Errors in Development Trials Using Technology Transfer in Contract Chemical Manufacturing
47 of 50
Improved Federal IT Project Schedule Performance Prediction Model
48 of 50
A Process-Based Cost Model to Improve Informal Recycling of End-of-Life Electronics
49 of 50
Integrate or Innovate: Controlling Schedule Risk in Major Defense Acquisition Programs
50 of 50